municipality - slovak republic
DESCRIPTION
Building of the Municipal Office in Senica is heated by the gas heat pump in bivalency with the district heating station. Heating is performed through the plate heaters. For the purposes of air-conditioning, new cooling was created. Cooling is performed through the water fan coils.
SOLUTION
1 GHP 25 HP + 1 AWS 25 HP
Energy produced: 48.150 kWh
Gas consumption: 23.104 kWh
(total 2.432 m3 –> 1 m3 = 9.5 kWh)
RESULTS
- Seasonal Power Factor – SPF – 2,08
(energy produced: 48.150 kWh – used gas: 23.104 kWh)